US$ 214.97
Contains 1x OO Scale pre-coloured plastic kit in 132 parts and moulded in 3 colours and clear parts
deployed by the 10th Armoured Division (UK) which was an amalgamation of the 1st Cavalry Regiment
whilst the icing on the cake is the livery application
fields and pastures with incredible realism
4P-020-412 GWR Toplight Mainline City GWR All Brown All Third 3910 Set 5 Code-250 Contains 1x OO Scale pre-colouredThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 214.97
US$ 192.00
US$ 151.00
US$ 109.00
US$ 116.00
US$ 649.98
US$ 299.98
US$ 151.00
US$ 399.98
US$ 363.00
US$ 230.00
US$ 123.00