A04301V Churchill Bridge Layer Class-20 Sharpening/Sanding block
Description
Sharpening/Sanding block
The 108s remained in regular service until 1990
Some examples even found new uses during construction of the Channel Tunnel and High Speed One
Exterior Details
A04301V Churchill Bridge Layer Class-20 Sharpening/Sanding blockTaking just 1. 5 minutes to deploy, the Tank Bridge No. 2 provided a Class 60 tracked load and a Class 40 wheeled load over a 30ft gap. The bridge was in one piece and mounted on the turretless tank. The launching arm was attached by a pivoting arm mechanism with rollers to the front of the tank, the other end of the arm being attached to the centre of the bridge. The bridge remained horizontal as it was raised and then lowered by the pivot arm across
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























