US$ 46.90
On the front of the locomotive
Square Boiler Access Panel
They are a very strong connector that will last forever
Mk3 coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset
R40151A LNER Mk4 Standard Coach E 12426 Class_Class 88 On the front of theBuilt at Metro Cammell's Washwood Heath factory, 314 Mk4 coaches were produced between 1989 and 1992. They were built specifically for use on the newly electrified East Coast Main Line, along with hopes that a second order for the West Coast Main Line would be placed at a later date, although this second order never transpired. Mk4 coaches featured many improvements over the Mk3s such as push button operated plug type doors, fully sealed gangways and
US$ 46.90
US$ 60.90
US$ 21.90